Accordingly
to the principles of campus construction layout, while running
the education programme in the available facilities, the university
has expedited the construction of additional buildings and facilities.
The newly-built library, the Information and Technology Centre,
the administration building, the structure hall and the students¡¯
apartment in Nanyuan and some other buildings have covered 80
000 m2. The students¡¯ apartments and dining hall have covered
70 000 m2 and the sport area under construction has covered additional
50 000 m2. At the end of 2002 and the beginning of 2003, Yifu
Building, Life Science Building and the apartments of the second
period began to be built. The university is trying to complete
Yifu Building, Life Science Building, the sport field, the apartments
of the second year students and the dining hall and so on in 2003.
Besides, the university will realize the objective of centralizing
administration and school-running.
In 2003
the university will start the construction of general training
gym, the art building, the Hydroelectric Museum, the College of
Science and Technology and the students¡¯ apartments of the third
period. In future, the campus area will be 200 hectares.
|